New research The Frontline Reporting Index 2027: eight measures for the work behind a safety record. The Frontline Reporting Index 2027 is out. Read the framework
Tandm Book a demo
  1. Home
  2. Industries
  3. Energy and utilities

Energy and utilities

Reports from the field, made in the field.

Energy and utility work is spread across plants, substations, networks, and wind and solar sites, often by small crews or people working alone. Tandm lets them report a hazard or a near miss where they are, in their own language, and writes the confirmed record into the system you already run.

Covers
Generation, networks, water and renewables
Reports
Hazards, near misses, incidents and pre-starts
Who reports
Field crews, lone workers and contractors
Language
Each worker in their own

What gets missed

The report written up later, from the van.

When the nearest computer is back at the depot, reports get made at the end of the day, if they get made. A hazard on an access road, a near miss during switching, a damaged ladder in a turbine: the person who saw it knows exactly where and what, and the form at the depot asks them to remember.

Contractors carry out much of the field work, and few of them have an account on the operator’s systems.

Exactly where

On a site, or a network, that spans kilometres.

What the hazard was, and what was done

The control applied at the time, not reconstructed later.

Who else was exposed

Including the rest of the crew and anyone working nearby.

How Tandm works here

Reported where the work is.

  1. The worker explains what they found, by voice or text, on site.
  2. Tandm asks for the details the form needs: the location, the hazard, the control and who was exposed.
  3. The worker confirms the account, and the record goes into your safety system.
See how Tandm works
Hazard reportTurbine 12
Technician

The bottom rung of the ladder in turbine 12 is bent.

Tandm

Have you stopped the climb, and is the ladder tagged out?

Technician

Climb’s stopped. I’ve tagged it and told the site lead.

Structured recordConfirmed
Hazard
Damaged ladder rung
Location
Turbine 12, tower base
Control
Climb stopped, ladder tagged out
Reported to
Site lead
Confirmed by the workerWritten to your safety system.

Who does the reporting

Everyone on site, in their own language.

Field crews and lone workers

They report where they are, by voice or text.

Contractors

A QR code lets contractor crews report without an account.

Depot and plant crews

A shared tablet or kiosk for crews without a company phone.

Vehicle and equipment checks

Pre-start inspections and equipment logbooks, completed hands-free.

Questions we get asked

Before a pilot.

Can crews run their pre-start checks with it?

Yes. Pre-start inspections and equipment logbooks can be completed hands-free.

Does Tandm replace our safety system?

No. The record goes into the system you already run, and nothing is migrated.

Read: Why contractors don’t report hazards on your site

Next step

Count the hours, then see it on your own reports.

The business case page works out what reporting takes from your crews, from your own numbers. The demo takes a report from your site in your crew’s language.